A 1.1 mile span of elevated highway, which connects to the actual bridge, is of major importance to the vitality of downtown San Francisco. Approximately 246,000 vehicles use the approaches on a daily basis, due to this heavy volume of traffic, engineers pinpointed it as a major problem area. The strategy for strengthening the elevated approaches is to add deeper pilings, larger foundations, and stronger support columns.

|

Mandal Pipe Co. has been an integral participant in the retrofit project, supplying 105,000’ of 24"diameter, ¾" thick steel pipe to be used as piling. With on time delivery, Mandal Pipe Company supplied a quality product, at a tremendous savings to the contractor.
|